Interview with CEO AVENSTON for PIDSUMKY on ObozTV

October 29th, 2019 Dmytro Lukomskyi, General Director of AVENSTON LLC, was invited to live PIDSUMKY (The Summaries) news studio on ObozTV as an expert in the alternative energy industry. An interesting discussion took place about the pressing problems, risks, and opportunities of the alternative energy market in Ukraine. Dmytro debunked the myths about green energy, talked about a unique station built by the Avenston team without a “single drop” of concrete, and trends in global electrification and distribution generation. The expert shared his thoughts on the approach to allocating quotas, reducing the green tariff and how the solar generation market will change after the introduction of auctions since 2020.

 

Useful articles:

Digitalization in the energetics – opportunities and technologies

Why is there so much hope for the use of digital technologies in the energetics? Is this not a new “favorite doll” we are offered to play with by huge IT corporations having almost unlimited global financial capabilities and influence? Why is the RES energy trend associated with the trend of the virtual technologies that cannot be “touched”?
Discover more

A hybrid PV system based on a car canopy

We are pleased to introduce our new product for business owners - a hybrid solar power plant based on a carport, which embodies modern technologies and solutions for the most efficient use of green energy.
Discover more

Performance Modeling Tools Overview

The calculation of the solar power plant allows you to predict accurately the amount of electricity generated by photovoltaic modules (solar panels) for specific terrain conditions, provided in case all components of the system are mounted and connected correctly.
Discover more

The usage of the Gantt chart for the design and construction of solar power plants

The project schedule is an important tool for managing the construction of a solar energy facility. It allows the project manager to plan the delivery of equipment and materials to the construction site, to synchronize the work of carriers and subcontractors, it is important for monitoring the construction process and project costs, to anticipate and prevent possible delays. Using the project schedule is much more effective than just a list-calendar of events
Discover more