SLOBODA-BUSHANSKA Solar PV power plant

Sloboda-Bushanska solar photovoltaic plant was built in 2012 in Yampol district of Vinnitsa region. Solar power plant is located on a plot of 3.88 hectares. The total capacity of power plants is 1875 kW. This facility was built to produce clean electricity and its subsequent sale to the grid using “green tariff”. The power plant is designed using SMA string inverters and Yingly multicrystalline silicon modules (2434 pcs by 235 W each). The solar station can save 1039 tons of coal or 627 thousand cubic meters of gas per year.

Solar power plant was designed and launched by Rentechno company, which acted in the project as the EPCM-contractor. The procurement of equipment to the project, as well as maintenance of construction works carried out in cooperation with Sunelectra. Our specialists completed the drafting process of the photovoltaic plant commissioning and carrying out of the object.

Project details:

  • Status – 100% completed
  • Power – 1,875 MWp
  • Land surface – 3,88 ha
  • Technology – multy-Si
  • Structure – fixed

List of services:

  • Feasibility study
  • Pre-design surveys;
  • Engineering and design (PV, LV);
  • Equipment procurement and logistics;
  • Construction and commissioning works.

Solar power plants are one of the key competencies for companies belonging to the Avenston group. We provide any necessary services for solar energy projects, starting from the support of the development stage to maintenance of already built photovoltaic power plants or systems. All the main stages of the implementation of such projects are carried out by us independently or with the involvement of selected partners. In the second case, all key processes are managed and controlled by Avenston’s in-house project managers. Our portfolio includes a large number of designed and built industrial solar PV power plants, home solar power plants, as well as other projects in related areas.

 

More projects:

RIVNIANSKA Solar PV Power Plant

The ground-mounted solar power station "Rivnianska" was built in the Kyrovograd region. The power plant occupies an area of 0,5 ha + 2000 sq.m. and the total power of the installed solar panels (photoelectric modules) is 0,24+0,16 MW.
Discover more

KOMYSHUVATE Solar PV Power Plant

The first line of KOMYSHUVATE Solar PV Power Plant with a capacity of 1 MW has been designed in the Kirovograd region, Ukraine. The goal is to get all benefits of a green tariff from the production and sale of electricity.
Discover more

LISOVI HRYNIVTSI Solar Power Plant

Our group of companies participated in the design and acted as the general contractor in the construction of the first phase of the 6.6 MW land-based solar power plant in the Khmelnytskyi region.
Discover more

RIVNIANSKA-2 Solar PV Power Plant

The solar power station (photovoltaic station) "Rivnianska-2" was built in the Kirovograd region. The power plant occupies an area of ha, and the total power of installed solar panels (photovoltaic modules) is 403 kW.