IVANIVKA-2 Solar PV Power Plant

Ivanivka-2 PV power plant was designed and launched by our group as a full-cycle EPC contractor. We performed all work on this facility, starting from getting grid permissions up to the commissioning and green tariff. This terrestrial solar power station was built to increase eco-clean electric power production and further profit-making from green tariff sales. The power station is projected with the application of 60 kW string inverters and 265 W poly-Si solar modules. All investors are connected to 0,4/35 kV transformer substations.

The project is a great example of the successful use of a solar power plant for a farm. Solar energy technologies are increasingly being implemented in various areas of the economy and business. Agro-industrial enterprises are increasingly investing in commercial solar power plants both for their own electricity consumption and for their sale to the external grid. A solar power plant for agriculture is a reliable and efficient investment for companies of all sizes and forms of ownership.

Key project details:

  • DC power:   3,08 MWp
  • Stage:   100% completed
  • Construction completion:   2016
  • Type of solar plant:   on-grid (35 kV)
  • Solar panels:   poly-Si (Jinko Solar)
  • Inverters:  SMA Tripower 60 kW
  • Structures:   ground mounted, fixed
  • Plant area:   6 ha
  • Location:   Kirovograd region, Ukraine

List of our services:

  • Feasibility study
  • Grid permissions obtaining
  • Pre-design surveys
  • Technological solutions analysis and selection
  • Electrical engineering, detailed design (PV, LV, MV)
  • Equipment Procurement and Logistics
  • Construction and Commissioning works
  • Grid connection, licensing and green tariff support
  • O&M services

Commercial solar power plants are one of the key competencies for companies belonging to the Avenston group. We provide any necessary services for solar energy projects, starting from the support of the development stage to the maintenance of already-built photovoltaic power plants or systems. All the main stages of the implementation of such projects are carried out by us independently or with the involvement of selected partners. In the second case, all key processes are managed and controlled by Avenston’s in-house project managers. Our portfolio includes a large number of designed and built industrial solar PV power plants, home solar power plants, as well as other projects in related areas.

 

More projects:

LISOVI HRYNIVTSI Solar Power Plant

Our group of companies participated in the design and acted as the general contractor in the construction of the first phase of the 6.6 MW land-based solar power plant in the Khmelnytskyi region.
Discover more

RIVNIANSKA-2 Solar PV Power Plant

The solar power station (photovoltaic station) "Rivnianska-2" was built in the Kirovograd region. The power plant occupies an area of ha, and the total power of installed solar panels (photovoltaic modules) is 403 kW.
Discover more

SLOBODA-BUSHANSKA Solar PV power plant

Sloboda-Bushanska solar photovoltaic plant was built in Yampol district of Vinnitsa region. Solar power plant is located on a plot of 3.88 hectares. The total capacity of power plants is 1875 kW.
Discover more

RIVNIANSKA Solar PV Power Plant

The ground-mounted solar power station "Rivnianska" was built in the Kyrovograd region. The power plant occupies an area of 0,5 ha + 2000 sq.m. and the total power of the installed solar panels (photoelectric modules) is 0,24+0,16 MW.
Discover more