Construction of Avenston RE Hub

In the development plans of our company, a special place is occupied by the project for the construction of the administrative complex Avenston RE Hub, the infrastructure of which will include an office, a conference room, own research center with a technological laboratory and much more. The facility is located in a nice location with area of 1.6 hectares near Kyiv with the most convenient transport accessibility.

The idea of building the complex is based on the maximum use of energy-efficient technologies, renewable energy sources and environmental materials. The project plans to apply and test in practice new solutions for green energy generation, which should form the basis of our future projects. The complex’s facilities will be built using BIPV technology, it is planned to install highly efficient solar power plants on the roofs, and energy supply will be strengthened through its own energy storage systems.

The complex will be a mini-town of several energy-efficient buildings. A gym, a summer sports ground, our own photo and video studio, a cinema hall, a cafe, a children’s room are just a small part of our ecosystem and pleasant amenities for residents and guests of the hub. On the territory of the complex will be installed test power generation systems using renewable energy sources, as well as charging stations for electric vehicles and small electric vehicles.

Among the possible ways to use the elements of this complex is to carry out various activities in the field of clean energy. The space of the conference hall planned for construction is easily transformed and adapted to events of any format: presentations, conferences, lectures, parties, project launches, trainings and other corporate events.

Our company completed the process of land allocation, performed the main engineering surveys and moved on to the stage of preliminary design work. At the same time, our specialists are studying the available technological possibilities for the engineering filling of the complex and working with architectural bureaus. We invite everyone to cooperation and are ready to consider new technologies and solutions with a view to their further application in our project.

Avenston RE Hub
 

Useful articles:

FIT in Ukraine

Green tariff was officially entered in Ukraine in 2009. The main obligation of the state was to buy back all amount of electric power, generated with the use of renewable energy sources (RES)
Discover more

Organization of solar panels manufacturing facilities

Avenston company offers its services in support of any complexity projects in the organization of solar panels production and other components used in solar energy (monocrystalline and multicrystalline silicon ingots, wafers, solar cells).
Discover more

A Cloudy Future of Ukraine’s PV industry

Dmytro Lukomskyi's column on Economic Truth business review about "cloudiness" over Ukrainian PV-market and new horizons for next year's industry
Discover more

Main model contracts for project implementation

In the world practice of construction and implementation of various projects, different types of contracts are used, which regulate relations in the field of management and control of construction.
Discover more