Lisovi Htynivtsi Solar Power Plant

Utility-Scale Solar EPC Case Study

This project showcases the experience gained by our team through renewable energy projects delivered under the Rentechno brand, which laid the foundation for the establishment of the Avenston Group in 2018. The case reflects the practical expertise developed across project development, engineering, construction, and the successful delivery of utility-scale renewable energy projects.

Rentechno participated in the design and acted as the general contractor in the construction of the first phase of the 6.6 MW land-based solar power plant in the Khmelnytskyi region. The area of the plot on which the solar power plant is located is 3.27 hectares. This facility is located near Khmelnytskyi, near the village of Lisovi Hrynivtsi. The number of installed photovoltaic solar modules is 8,228. The peak power of the first stage is 2,221 MW, which corresponds to the annual generation of 2,5 million kWh of electricity and replaces the emission of carbon dioxide into the atmosphere in the amount of more than 1,000 tons per year. Services provided: design, supply of equipment, and construction of a solar power plant.

About Avenston Today

Avenston focuses on renewable energy project development, investment partnerships, implementation support, and asset management. Building on the experience gained through more than a decade of renewable energy projects, the company supports international investors and strategic partners in developing and operating renewable energy assets in Ukraine.

 

More projects:

Solar-Expo Solar Power Plant Investment Project

A renewable energy investment case study demonstrating Avenston's experience as an equity investor in a 1 MWp solar power plant—from project development and operation to successful asset exit.
Discover more

Lazurne Solar Power Plant

Solar photovoltaic power station was built in Skadovsk district of Kherson region. The PV power plant covers an area of 20 hectares, with a total installed capacity of photovoltaic modules is 9,806 MW. This facility was built to produce clean electricity and its subsequent sale to the grid using the green tariff.
Discover more

Track-Solar Power Plant

The roof-top solar power plant (photovoltaic station) "Track-Solar" was built in the Kirovograd region. The power plant covers an area of 1,800 square meters, and the total power of installed solar panels (photovoltaic modules) is 227 kWp.
Discover more

Komyshuvate Solar PV Power Plant

The first line of KOMYSHUVATE Solar PV Power Plant with a capacity of 1 MW has been designed in the Kirovograd region, Ukraine. The goal is to get all benefits of a green tariff from the production and sale of electricity.
Discover more