Kononivka Solar PV Power Plant

Utility-Scale Solar Engineering and Technical Advisory Case Study

«Kononivka» is a 2.7 MW solar photovoltaic power plant designed by AVENSTON in the 4th quarter of 2019 at the request of a Ukrainian investor. The project documentation of the stage “Project” was developed, which includes detailed technical solutions elaboration following the customer’s needs.

Ground-based solar power plant PV Plant Solar K is located in east part of Ukraine – Kononivka, Vyshchebulatetska settlement council, Lubenskyi district, Poltavska region, Ukraine. The power plant was put into operation on 2020. “Solar K” LLC is a legal entity operating the power plant. It obtained the license for electricity generation on December 23, 2020 and was permitted for the Feed-in-tariff in hryvnias equivalent of 10.97 eurocents starting from December 30, 2020.

 

Key project details:

  • Capacity – 2,7 MWp
  • Area – 4 ha
  • Solar panels – poly-Si (375 Вт)
  • Inverters – Huawei Sun 2000-60KTL and Huawei Sun 2000-50KTL
  • Location – Poltava region, Ukraine

Our services:

  • Consulting and assistance in business planning of the project
  • Analysis and selection of major technological solutions
  • Development of project documentation of the stage “Project”
  • Consulting on optimization of procurement and delivery of basic equipment and materials

Avenston Today

Today, Avenston operates as an on-the-ground development and operating partner for renewable energy projects in Ukraine.

The company focuses on:

  • Utility-Scale Solar PV;
  • Battery Energy Storage Systems (BESS);
  • renewable energy project development support;
  • investment partnerships and joint ventures;
  • project implementation support;
  • asset management.

Avenston works with international investors, developers, infrastructure funds, technology providers, and energy companies seeking renewable energy opportunities in Ukraine.

 

More projects:

Track-Solar Power Plant

The roof-top solar power plant (photovoltaic station) "Track-Solar" was built in the Kirovograd region. The power plant covers an area of 1,800 square meters, and the total power of installed solar panels (photovoltaic modules) is 227 kWp.
Discover more

Starobeshevo Solar PV power plant

Starobeshevo solar photovoltaic power station will be built near Donetsk on a area plot of 23.1 hectares. The total capacity of the power plant will be 12 MW. This facility is designed to produce clean electricity and its subsequent sale to the fgrid using "green tariff".
Discover more

Rooftop Solar Power Plant in Ternopil

A solar photovoltaic power station was built in Ternopil on the roof of a manufacturing plant. The solar modules occupy an area of ​​1120 sq.m. PV plant type: rooftop, on-grid, for self-consumption.
Discover more

Rasvet Solar PV Power Plant

The solar power plant (photoelectric station) "Rasvet" was built in the Kirovograd region. The power plant occupies an area of 1.5 hectares and the total power of installed solar panels (photovoltaic modules) is 629 kW.
Discover more