VELYKI BEREGY Solar Power Plant
AVENSTON opens the market to the global players for the purpose of risk-free and successful investment in RES projects in Ukraine. Thus, in April 2019, the specialists of our company conducted the selection and analysis of shovel-ready projects for the construction of a solar station commissioned by one of the Canadian Investment Funds. As a result of this work, an in-depth analytical analysis of the solar energy market was conducted, the site for construction of a PV-plant with a capacity of 9.96 MW (AC) was found and proposed, the effective technical solutions were suggested, the effective top-level equipment was chosen, the financial model of the solar power plant was created and the necessary calculations were made .
At the request of the Customer, the Avenston team provided high quality and timely full cycle of expert and consulting support for the selected project.
Our services:
- Analysis of the current legislation and solar energy industry of Ukraine;
- Analysis of current proposals of shovel ready projects;
- selection of the best site that meets all the requirements and wishes of the Customer;
- Analysis and selection of main technological solutions;
- Consulting on purchase optimization and delivery of basic equipment;
- Development of the site plan of the PV-station;
- Consulting and business planning of the project;
- Development of financial model of PV-station;
- Feasibility study of the project;
- PVSyst-simulation
Key project details:
- Capacity – 9,996 MW (AC), 11,88 MW (DC)
- Type of solar plant – on-grid (35 kV)
- Solar modules – Hanwha Q.POWER L-G5 330 полі-Si (330 Вт)
- Solar inverters – Huawei Sun 2000-60KTL
- Mounting structures: Ground mounted, fixed
- The expected annual produced energy – 4894 MWh.
- Location: Transcarpathian region, Ukraine
Solar power plants are one of the key competencies for companies belonging to the Avenston group. We provide any necessary services for utility-scale solar energy projects, starting from the support of the development stage to maintenance of already built photovoltaic power plants or systems. All the main stages of the implementation of such projects are carried out by us independently or with the involvement of selected partners. In the second case, all key processes are managed and controlled by Avenston’s in-house project managers. Our portfolio includes a large number of designed and built industrial solar PV power plants, home solar power plants, as well as other projects in related areas.
More projects:
GUTA-2 Solar PV Power Plant
The solar power plant (photoelectric plant) was built in the Uzhgorod district of the Transcarpathian region. The power plant covers an area of 5.73 hectares and the total capacity of installed solar panels (photovoltaic modules) is 3.48 MW.
Discover more
PARNIKI Solar PV power plant
Ground based Parniki solar photovoltaic plant was built in Yampol district of Vinnitsa region. Solar power plant is located on a land plot of 3.1 hectares. The total capacity of power plants is 1417 kW.
Discover more
STAROBESHEVO Solar PV power plant
Starobeshevo solar photovoltaic power station will be built near Donetsk on a area plot of 23.1 hectares. The total capacity of the power plant will be 12 MW. This facility is designed to produce clean electricity and its subsequent sale to the fgrid using "green tariff".
Discover more
FURSY Solar PV Power Plant
Our company’ specialists prepared a detailed feasibility study and performed preliminary design for 3 solar power plants with a total capacity of 67.5 MWp located in the Kyiv region.
Discover more