The UTC solar power plant is installed on the roof of a production facility in the Vinnytsia region. The complex of services on the arrangement of the rooftop solar power plant was completed by Avenston in September 2024. The project uses LONGi Solar 580 W solar modules and Huawei 100 kW on-grid inverters. Galvanized supporting metal structures of the “East-West” type have a special ballast system for roofs, which makes it possible to install without breaking the tightness of the existing roof with a membrane.