Rivinianska-2 Solar PV Power Plant

Utility-Scale Solar EPC Case Study

This project showcases the experience gained by our team through renewable energy projects delivered under the Rentechno brand, which laid the foundation for the establishment of the Avenston Group in 2018. The case reflects the practical expertise developed across project development, engineering, construction, and the successful delivery of utility-scale renewable energy projects.

Rivnianska-2 PV power plant was designed and launched by our group as a full-cycle EPC-contractor. We performed all work on this facility, starting from getting grid permissions and up to the commissioning and green tariff obtaining. This terrestrial solar power station was built to increase eco-clean electric power production and further  profit-making from green tariff sales. Power station is projected with application of string invertors and polycrystalline silicon solar modules.

Key project details:

  • DC power:   0,403 MWp
  • Stage:   100% completed
  • Construction completion:   2016
  • Type of solar plant:   on-grid (10 kV)
  • Solar panels:   poly-Si (Jinko Solar)
  • Inverters:  SMA Tripower 60 kW
  • Structures:   ground mounted, fixed
  • Plant area:   1,2 ha
  • Location:   Kirovograd region, Ukraine

List of our services:

  • Feasibility study
  • Grid permissions obtaining
  • Pre-design surveys
  • Technological solutions analysis and selection
  • Electrical engineering , detailed design (PV, LV, MV)
  • Equipment Procurement and Logistics
  • Construction and commissioning works
  • Grid connection, licensing and green tariff support

About Avenston Today

Avenston focuses on renewable energy project development, investment partnerships, implementation support, and asset management. Building on the experience gained through more than a decade of renewable energy projects, the company supports international investors and strategic partners in developing and operating renewable energy assets in Ukraine.

 

More projects:

Starobeshevo Solar PV power plant

Starobeshevo solar photovoltaic power station will be built near Donetsk on a area plot of 23.1 hectares. The total capacity of the power plant will be 12 MW. This facility is designed to produce clean electricity and its subsequent sale to the fgrid using "green tariff".
Discover more

Rivinianska-2 Solar PV Power Plant

The solar power station (photovoltaic station) "Rivnianska-2" was built in the Kirovograd region. The power plant occupies an area of ha, and the total power of installed solar panels (photovoltaic modules) is 403 kW.
Discover more

Track-Solar Power Plant

The roof-top solar power plant (photovoltaic station) "Track-Solar" was built in the Kirovograd region. The power plant covers an area of 1,800 square meters, and the total power of installed solar panels (photovoltaic modules) is 227 kWp.
Discover more

Weligen & Weliton Solar Portfolio

The Weligen & Weliton Solar Portfolio showcases Avenston founders' experience across the renewable energy investment lifecycle—from greenfield development and RTB project transactions to owner-side technical advisory.
Discover more