Archive

Restoring solar power plants

Avenston Engineering is actively engaged in the restoration of solar power plants damaged as a result of the war with russia.
Discover more

Evolution and Growth in Conditions of Military Aggression

Interview with Dr. Dmytro Lukomskyi, co-founder and Chairman of the supervisory board of Avenston Group for tubetorial.com - about solar energy during military aggression by russia
Discover more

The design of PV power plant has been developed

Avenston Engineering specialists have completed the development of design documentation for a commercial rooftop solar power plant. The design was carried out in one stage in compliance with all requirements and standards for objects of this type.
Discover more

Commissioning of utility-scale PV power plant

The team of Avenston Engineering carried out work on the launch of a ground-based solar power plant into commercial operation. This is another one utility-scale RE facility that was put into operation thanks to the coordinated efforts of the technical department of our company.
Discover more

Equipment exchange fund for solar power plants

We would like to inform you about the expansion of equipment list at our service warehouse. Avenston constantly stores an equipment exchange fund for the main brands and types of solar inverters and other equipment for solar power plants.
Discover more

Implementation of hydrogen energy projects

Our company is engaged in the analysis of the possibilities of using hydrogen in the fields of transport, energy and industry, with a focus on the prospects for introducing hydrogen technologies into projects using renewable energy sources.
Discover more

Energy efficiency and partnership

The reports of the International Energy Agency (IEA) note that, globally, energy efficiency measures have reached a level that exceeds the contribution to energy supply by any other area of development.
Discover more

Acceptance tests of 35 kV equipment

The specialists of Avenston and Avenston Engineering organized the implementation of commissioning works and acceptance tests for high-voltage 35 kV equipment.
Discover more