Tavan-2 solar PV power plant has been developed, designed and built by our group. We acted in the project as developer and EPC-contractor and performed all work on this facility, starting from getting land and grid permits and up to the commissioning and green tariff obtaining. The construction phase of PV power plant was completed in autumn 2017. However, due to the necessity for reconstruction of external electrical grid and local substation the start of the PV power plant operation was delayed until the beginning of 2018.

Key project details

  • DC power: 8,2 MWp
  • Stage:  100% completed
  • Construction completion: 2017
  • Type of solar plant: on-grid (10 kV)
  • Solar panels: poly-Si (Hanwha Q CELLS)
  • Inverters: SMA Tripower 60 kW
  • Structures:  ground mounted, fixed
  • Plant area: 16 ha
  • Location: Beryslav, Kherson region, Ukraine

List of our services:

  • Project development and turn-key project management
  • Feasibility study
  • Land and grid permissions obtaining
  • Pre-design surveys
  • Engineering and design (PV, LV, MV, external grids)
  • Procurement
  • Construction
  • Grid connection
  • Licensing and green tariff support