SKADOVSK Solar power plant

Solar photovoltaic power station was built in 2012 in Skadovsk district of Kherson region. The PV power plant covers an area of 20 hectares, with a total installed capacity of photovoltaic modules is 9,806 MW. This facility was built to produce clean electricity and its subsequent sale to the grid using the green tariff. The power plant is designed with the use of AEG Power Solutions central inverters, as well as crystalline silicon modules.

In this project, Rentechno acted as a technical consultant to prepare a business plan for the project and developing a full feasibility study for the construction of solar power plant. Also we were an engineering outsourcing provider for selected parts of design documentation (PV simulation, mechanical and electrical parts up to 10 kV).

Project details:

  • Status – 100% completed
  • Power – 9,806 MWp
  • Land surface – 20,0 ha
  • Technology – c-Si
  • Structure – fixed

List of services:

  • Busines panning.
  • Technical feasibility study.
  • Procurement consultng.
  • Engineering (partially).

Utility-scale solar power plants are one of the key competencies for companies belonging to the Avenston group. We provide any services for solar power projects, starting from the support of the development stage to maintenance of already built photovoltaic power plants or systems. All the main stages of the implementation of such projects are carried out by us independently or with the involvement of selected partners. In the second case, all key processes are managed and controlled by Avenston’s in-house project managers. Our portfolio includes a large number of designed and built industrial solar PV power plants, home solar power plants, as well as other projects in related areas.