Chupakhovka solar power plant

Project details:

  • Status – completed
  • Capacity – 10 kWp
  • Surface of roof – 100 sq.m.
  • Solar module type – poly-Si
  • Mounting structures – fixed
  • Construction – 2016

Rooftop solar photovoltaic station 10 kW was assembled and connected to the grid in 2016. This residential solar system has been designed and built by our company, which acted in the project as the EPC-contractor. Solar plant has been designed for the production and sale of electricity to get all benefits of a green tariff acting in Ukraine.

List of our services provided in this project was the following:

  • Turn-key project management;
  • Engineering;
  • Procurement;
  • Construction;
  • Grid connection;
  • Commissioning.

Changes in world energy are inevitable

Data on the development of world energy, including renewable energy sources (RES), obtained in mid-2018, show that an important milestone has been reached - the generating power of energy from the sun and wind exceeds one terawatt
Discover more

Technology and operating principles of heat generators for alternative fuels

Existing technologies of hard biopropellant incineration are briefly analyzed in this article. These technologies are used in thermal energy generation systems on renewable fuel types from domestic and foreign producers.
Discover more

Energy Generation Forecast for Solar Power Plants

Forecasts of future solar energy system output allows grid operators and utilities to proactively manage variable output, and thus integrating solar resources into the existing grid at lower costs to society.
Discover more

The usage of the Gantt chart for the design and construction of solar power plants

The project schedule is an important tool for managing the construction of a solar energy facility. It allows the project manager to plan the delivery of equipment and materials to the construction site, to synchronize the work of carriers and subcontractors, it is important for monitoring the construction process and project costs, to anticipate and prevent possible delays. Using the project schedule is much more effective than just a list-calendar of events
Discover more